Home/Coordinated window contracting from drawings to installation
Architecture and glazing for coordinated window contracting from drawings to installation

COMPLETE WINDOW CONTRACTING

Coordinated window contracting from drawings to installation

For major construction projects we combine technical review, quantity take-off, procurement, logistics, installation and handover in one clearly defined undertaking. As the client you have one party responsible for the complete window delivery, rather than separate contracts for materials, transport and installation. As a window supplier for construction projects we define a clear scope so that materials, logistics and installation stay aligned with the construction programme.

Who this is for

A window contract is appropriate when windows and glazed sections form a significant part of the building and must be coordinated with other trades:

  • general contractors and building contractors on new-build projects
  • hall builders and frame suppliers who want to subcontract the window package
  • property owners carrying out window replacement in larger phases
  • developers of industrial, logistics, office and retail projects

What is included

  • Quantity take-off and technical review – we review the documents and define products, interfaces, responsibilities and delivery boundaries before work proceeds.
  • Procurement and delivery planning – products are ordered against the programme and deliveries are split into phases.
  • Installation and coordination – installation resources are coordinated with the site programme, scaffolding and lifting.
  • Inspection and documentation – inspections, deviation handling and handover documentation.

A clear scope from the outset

Most problems in a window delivery arise at the interfaces: who provides window boards, linings, sealing to the façade, power to automatic doors or smoke vents? We review the interfaces at quotation stage and write them into the scope, so that nothing falls between parties.

When is a window contract better than a materials-only purchase?

If the project has many window types, several phases or high requirements for tightness and documentation, it is often worth placing materials and installation with one party. You get a price for the complete delivery, one party responsible for performance, and fewer interfaces to coordinate on site. For smaller projects we can also supply materials with installation instructions.

Process from drawings to installation

  1. 01

    Tender documents – drawings, window schedule, technical specification, contract preliminaries and programme.

  2. 02

    Review and queries – we raise technical questions early rather than packing the quotation with reservations.

  3. 03

    Quotation and contract – a clear scope, payment plan and delivery boundaries.

  4. 04

    Detailed design – dimensional checks and production information.

  5. 05

    Phased delivery – against the construction programme and lifting conditions.

  6. 06

    Installation and inspection – with inspections and documented deviations.

  7. 07

    Handover – documentation and final inspection.

Control throughout production

Material flows and installation resources are coordinated with the site programme. Deviations are handled systematically and documented.

Delivery throughout Sweden

We undertake window contracts throughout the country and plan transport and installation resources according to the project location.

Industrifönster is part of Toseto Sweden AB

Toseto also supplies structural frames and building envelopes. When the windows form part of the same delivery, there is one less interface between the frame, the façade and the windows. toseto.se

Typical interfaces we resolve at quotation stage

  • window boards, linings and reveal finishes – internally and externally
  • sealing and flashing to the façade system
  • power to door automation, smoke vents and access control
  • scaffolding, lifting and handling on site
  • removal of packaging and waste

One party responsible for performance

When materials and installation are purchased separately, it is easy for discussions to arise about who is responsible if a window leaks or a door does not close. In a window contract we are responsible for both the product and the workmanship. That simplifies warranty handling and gives the client a single contact from quotation to final inspection.

FAQ

Frequently asked questions

NEXT STEP

Do you have a project to price?

Request a quotation